# Date::Manip::Calc - phpMan

## NAME
    [Date::Manip::Calc] - describes date calculations

## SYNOPSIS
    Two objects (both of which are either [Date::Manip::Date] or
    [Date::Manip::Delta] objects) may be used to creates a third object based
    on those two.

       $delta  = $date->calc($date2 [,$subtract] [,$mode]);

       $date2  = $date->calc($delta [,$subtract]);
       $date2  = $delta->calc($date1 [,$subtract]);

       $delta3 = $delta1->calc($delta2 [,$subtract] [,$no_normalize]);

## DESCRIPTION
    This document describes the different types of calculations that can be
    done using dates and deltas. Date calculations are much more complicated
    than they initially appear, so this document is fairly large.

    The complication in date calculations is due to the fact that it is
    impossible to express some parts of a delta as an exact length. Some
    examples will illustrate this:

    As an example, let's take two dates and determine how much time elapsed
    between them:

       Nov 3 2016 11:00:00
       Dec 5 2016 12:00:00

       Elapsed time: 770 hours

    There are several ways to describe the time that elapsed. The first way
    is to give the difference exactly. This is the exact delta.

    An exact delta is always described in terms of hours, minutes, and
    seconds.

    The problem with this is that we don't think in terms of exact deltas.
    We think in terms which cannot be expressed exactly.

    For example, most people would look at those two dates and think:

       Perceived: 1 month, 2 days, 1 hour

    But the two dates:

       Feb 3 2016 11:00:00
       Mar 5 2016 12:00:00

       Elapsed time: 745 hours
       Perceived: 1 month, 2 days, 1 hour

    Some fields in a delta do not have an exact length. A year is usually
    365 days long, but sometimes it is 366. A month might be 28, 29, 30, or
    31 days long.

    Perhaps the most unexpected difficulty is that days are not of constant
    length. Most people would define a day as 24 hours, but when you take
    daylight saving time into account that definition produces unexpected
    results. The following calculation illustrates this:

       Nov 5, 2011 02:30 EDT
       + 24 hour

       Result: Nov 6, 2011 01:30 EST

    This immediately causes most people to redefine a day as the amount of
    time between the same wall clock time. For example, the amount of time
    between noon one day and noon the next (regardless of daylight saving
    time changes).

    This definition doesn't work either. For example:

       Mar 12, 2011 02:30 EST
       + 1 day (same time next day)

       Result: Mar 13 02:30 EST

    But that date does not exist! Neither does:

       Result: Mar 13 02:30 EDT

    An alternate calculation could be:

       Nov 5, 2011 01:30 EDT
       + 1 day (same time next day)

       Result: Nov 6, 01:30 EDT
       Result: Nov 6, 01:30 EST

    Both of those results exist. Which result did you mean? The first one is
    probably correct (since it is 24 hours later), but an hour later, you
    will have the same clock time again.

    So, the same time next day definition doesn't work at all for some dates
    (during a 'spring forward' type daylight saving time transition) and is
    ambiguous for others (during a 'fall back' type daylight saving time
    transition).

    Calculations involving exact deltas are unambiguous in all cases.

    A second class of delta is called a semi-exact delta, and these add days
    (and weeks) to the delta, and treats days as a "same time next day" at
    all times except the two cases where the resulting date falls in the
    period where a daylight saving time transition is occurring. Then it
    falls back to the 24 hour definition.

    A final class of delta is an approximate delta which includes all of the
    fields (years and months). This allows [Date::Manip] to handle deltas in a
    way that is consistent with how most people perceive the elapsed time.
    It should be noted that there is some uncertaintly there as not
    everyone's definition of how a delta is perceived is the same, but in
    general, they should be closer to what most people think of.

## TYPES OF CALCULATIONS
    This document describes the different types of calculations.
    Calculations involve two types of [Date::Manip] objects: dates and deltas.
    These are described in the [Date::Manip::Date] and [Date::Manip::Delta]
    manuals respectively.

    Two objects (two dates, two deltas, or one of each) are used. In all
    cases, if a second object is not passed in, undef is returned.

    There are 3 types of calculations:

    Date/Date calculations
        A calculation involving 2 dates is used to determine the amount of
        time (the delta) between them.

           $delta  = $date1->calc($date2 [,$subtract] [,$mode]);

        Two dates can be worked with and a delta will be produced which is
        the amount of time between the two dates.

        $date1 and $date2 are [Date::Manip::Date] objects with valid dates.
        The [Date::Manip::Delta] object returned is the amount of time between
        them. If $subtract is not passed in (or is 0), the delta produced
        is:

           DELTA = DATE2 - DATE1

        If $subtract is non-zero, the delta produced is:

           DELTA = DATE1 - DATE2

        The $subtract argument has special importance when doing approximate
        calculations, and this is described below.

        If either date is invalid, a delta object will be returned which has
        an error associated with it.

        The $mode argument describes the type of delta that is produced and
        is described below in "MODE".

    Date/Delta calculations
        Date/delta calculations can be performed using either a
        [Date::Manip::Date] or [Date::Manip::Delta] object as the primary
        object:

           $date2  = $date1->calc($delta [,$subtract]);
           $date2  = $delta->calc($date1 [,$subtract]);

        A date and delta can be combined to yield a date that is the given
        amount of time before or after it.

        $date1 and $delta are [Date::Manip::Date] and [Date::Manip::Delta]
        objects respectively. A new [Date::Manip::Date] object is produced. If
        either $date1 or $delta are invalid, the new date object will have
        an error associated with it.

        Both of the calls above perform the same function and produce
        exactly the same results.

        If $subtract is not passed in, or is 0, the resulting date is formed
        as:

           DATE2 = DATE1 + DELTA

        If $subtract is non-zero, the resulting date is:

           DATE2 = DATE1 - DELTA

        The $subtract argument has special importance when doing approximate
        calculations, and this is described below in "SUBTRACTION".

    Delta/Delta calculations
        Delta/delta calculations can be performed to add two amounts of time
        together, or subtract them.

           $delta3 = $delta1->calc($delta2 [,$subtract] [,$no_normalize]);

        If $subtract is not passed in, or is 0, the resulting delta formed
        is:

           DELTA3 = DELTA1 + DELTA2

        If $subtract is non-zero, then the resulting delta is:

           DELTA3 = DELTA1 - DELTA2

        $delta1 and $delta2 are valid [Date::Manip::Delta] objects, and a new
        [Date::Manip::Delta] object is produced.

        $no_normalize can be the string 'nonormalize' or a non-zero value
        (in which case $subtract MUST be entered, even if it is 0).

## MODE
    [Date::Manip] calculations can be divided into two different categories:
    business and non-business; and within those are three sub-categories:
    exact, semi-exact, and approximate.

    Business and non-business calculations
        A business calculation is one where the length of the day is
        determined by the length of the work day, and only business days
        (i.e. days in which business is conducted) count. Holidays and
        weekends are omitted (though there is some flexibility in defining
        what exactly constitutes the work week as described in the
        [Date::Manip::Config] manual). This is described in more detail below
        in "BUSINESS MODE CONSIDERATIONS".

        A non-business mode calculation is the normal type of calculation
        where no days are ignored, and all days are full length.

    Exact, semi-exact, and approximate calculations
        An exact calculation is one in which the delta used (or produced) is
        an exact delta. An exact delta is described in more detail in the
        [Date::Manip::Delta] manual, but the short explanation is that it is a
        delta which only involves fields of an exactly known length (hours,
        minutes, and seconds). Business deltas also include days in the
        exact part. The value of all other fields in the delta will be zero.

        A semi-exact calculation is one in which the deltas used (or
        produced) is a semi-exact delta. This is also described in the
        [Date::Manip::Delta] manual, but the short explanation is that it
        includes days and weeks (for standard calculations) or weeks (for
        business calculations) in addition to the exact fields. A semi-exact
        day is defined as the same clock time on two successive days. So
        noon to noon is 1 day (even though it may not be exactly 24 hours
        due to a daylight saving time transition). A week is defined as 7
        days. This is described in more detail below.

        An approximate calculation is one in which the deltas used (or
        produced) are approximate, and may include any of the fields.

    In date-delta and delta-delta calculations, the mode of the calculation
    will be determined automatically by the delta. In the case of date-date
    calculations, the mode is supplied as an argument.

    Mode in date-date calculations
        When doing a date-date calculation, the following call is used:

           $delta = $date1->calc($date2 [,$subtract] [,$mode]);

        $mode defaults to "exact". The delta produced will be be either a
        business or non-business delta; exact, semi-exact, or approximate,
        as specified by $mode.

        Currently, the possible values that $mode can have are:

           exact    : an exact, non-business calculation
           semi     : a semi-exact, non-business calculation
           approx   : an approximate, non-business calculation

           business : an exact, business calculation
           bsemi    : a semi-exact, business calculation
           bapprox  : an approximate, business calculation

    Mode in date-delta calculations
        When doing calculations of a date and a delta:

           $date2 = $date1->calc($delta [,$subtract]);
           $date2 = $delta->calc($date1 [,$subtract]);

        the mode is not passed in. It is determined exclusively by the
        delta. If $delta is a business delta, A business calculation is
        done. If $delta is a non-business delta, a non-business calculation
        will be done.

        The $delta will also be classified as exact, semi-exact, or
        approximate based on which fields are non-zero.

    Mode in delta-delta calculations
        When doing calculations with two deltas:

           $delta3 = $delta1->calc($delta2 [,$subtract]);

        the mode is not passed in. It is determined by the two deltas.

        If both deltas are business mode, or both are non-business mode, a
        new delta will be produced of the same type.

        It one of the deltas is a business mode and the other is not, the
        resulting delta will have an error condition since there is no
        direct correlation between the two types of deltas. Even though it
        would be easy to add the two together, it would be impossible to
        come up with a result that is meaningful.

        If both deltas are exact, semi-exact, or approximate, the resulting
        delta is the same. If one delta is approximate and one is not, then
        the resulting delta is approximate. It is NOT treated as an error.
        Likewise, if one is semi-exact and the other exact, a semi-exact
        delta is produced.

## TIMEZONE CONSIDERATIONS
    date-date calculations
        When doing a business calculation, both dates must be in the same
        time zone or an error is produced.

        For non-business calculations, when calculating the difference
        between two dates in different time zones, $date2 will be converted
        to the same timezone as $date1 and the returned date will be in this
        timezone.

    date-delta calculations
        When adding a delta to a date, the resulting date will be in the
        same time zone as the original date.

    delta-delta calculations
        No timezone information applies.

    It should also be noted that daylight saving time considerations are
    currently ignored when doing business calculations. In common usage,
    daylight saving time changes occurs outside of the business day, so the
    business day length is constant. As a result, daylight saving time is
    ignored.

## BUSINESS MODE CONSIDERATIONS
    In order to correctly do business mode calculations, a config file
    should exist which contains the section defining holidays (otherwise,
    weekends will be ignored, but all other days will be counted as business
    days). This is documented below, and in the [Date::Manip::Config] section
    of the documentation. Some config variables (namely WorkWeekBeg,
    WorkWeekEnd, WorkDayBeg, WorkDayEnd, and WorkDay24Hr) defined the length
    of the work week and work day.

    If the workday is defined as 08:00 to 18:00, a work week consisting of
    Mon-Sat, and the standard (American) holidays, then from Tuesday at
    12:00 to the following Monday at 14:00 is 5 days and 2 hours. If the
    "end" of the day is reached in a calculation, it automatically switches
    to the next day. So, Tuesday at 12:00 plus 6 hours is Wednesday at 08:00
    (provided Wed is not a holiday). Also, a date that is not during a
    workday automatically becomes the start of the next workday. So, Sunday
    12:00 and Monday at 03:00 both automatically becomes Monday at 08:00
    (provided Monday is not a holiday).

    Note that a business week is treated the same as an exact week (i.e.
    from Tuesday to Tuesday, regardless of holidays). Because this means
    that the relationship between days and weeks is NOT unambiguous, when a
    semi-exact delta is produced from two dates, it will be in terms of
    d/h/mn/s (i.e. no week field).

    Anyone using business mode is going to notice a few quirks about it
    which should be explained. When I designed business mode, I had in mind
    what a business which promises 1 business day turnaround really means.

    If you do a business calculation (with the workday set to 9:00-17:00),
    you will get the following:

       Saturday at noon + 1 business day = Tuesday at 9:00
       Saturday at noon - 1 business day = Friday at 9:00

    What does this mean?

    As an example, say I use a business that works 9-5 and they have a drop
    box so I can drop things off over the weekend and they promise 1
    business day turnaround. If I drop something off Friday night, Saturday,
    or Sunday, it doesn't matter. They're going to get started on it Monday
    morning. It'll be 1 business day to finish the job, so the earliest I
    can expect it to be done is around 17:00 Monday or 9:00 Tuesday morning.
    Unfortunately, there is some ambiguity as to what day 17:00 really falls
    on, similar to the ambiguity that occurs when you ask what day midnight
    falls on. Although it's not the only answer, [Date::Manip] treats midnight
    as the beginning of a day rather than the end of one. In the same way,
    17:00 is equivalent to 9:00 the next day and any time the date
    calculations encounter 17:00, it automatically switch to 9:00 the next
    day. Although this introduces some quirks, I think this is justified. I
    also think that it is the way most people think of it. If I drop
    something off first thing Monday morning, I would expect to pick it up
    first thing Tuesday if there is 1 business day turnaround.

    Equivalently, if I want a job to be finished on Saturday (despite the
    fact that I cannot pick it up since the business is closed), I have to
    drop it off no later than Friday at 9:00. That gives them a full
    business day to finish it off. Of course, I could just as easily drop it
    off at 17:00 Thursday, or any time between then and 9:00 Friday. Again,
    it's a matter of treating 17:00 as ambiguous.

    So Saturday + 1 business day = Tuesday at 9:00 (which means anything
    from Monday 17:00 to Tuesday 9:00), but Monday at 9:01 + 1 business day
    = Tuesday at 9:01 which is unambiguous.

    It should be noted that when adding years, months, and weeks, the
    business day is ignored. Once they've been added, the resulting date is
    forced to be a business time (i.e. it moves to the start of the next
    business day if it wasn't one already) before proceeding with the days,
    hours, minutes, and seconds part.

EXACT, SEMI-EXACT, AND APPROXIMATE DATE/DELTA CALCULATIONS
    This section contains more details about exactly how exact, semi-exact,
    and approximate calculations are performed for date/delta calculations.

    All calculations make use of some exact quantities, including:

      1 year   = 12 months
      1 week   = 7 days
      1 hour   = 60 minutes
      1 minute = 60 seconds

    This leaves two relationships which are not exact:

      1 month  = ? days
      1 day    = ? hours

    For non-business calculations, a day is usually 24 hours long. Due to
    daylight saving time transitions which might make a day be 23 or 25
    hours long (or in some cases, some other length), the relation is not
    exact. Whenever possible, a day is actually measured as the same time on
    two days (i.e. Tuesday at noon to Wednesday at noon) even if that period
    is not precisely 24 hours. For business calculations, a days length is
    determined by the length of the work day and is known exactly.

    Exact calculations involve ONLY quantities of time with a known length,
    so there is no ambiguity in them.

    Approximate and semi-exact calculations involve variable length fields,
    and so they must be treated specially.

    In order to do an approximate or semi-exact calculation, the delta is
    added to a date in pieces, where the fields in each piece have an exact
    and known relationship.

    For a non-business calculation, a calculation occurs in the following
    steps:

      year/month fields added
      week/day fields added
      hour/minute/second fields added

    For a business calculation, the steps are:

      year/month fields added
      week field added
      day field added
      hour/minute/second fields added

    After each step, a valid date must be present, or it will be adjusted
    before proceeding to the next step. Note however that for business
    calculations, the first step must produce a valid date, but not
    necessarily a business date. The second step will produce a valid
    business date.

    A series of examples will illustrate this.

    A date and non-business approximate delta
           date  = Mar 31 2001 at 12:00:00
           delta = 1 year, 1 month, 1 day, 1 hour

        First, the year/month fields are added without modifying any other
        field. This would produce:

           Apr 31, 2002 at 12:00

        which is not valid. Any time the year/month fields produce a day
        past the end of the month, the result is 'truncated' to the last day
        of the month, so this produces:

           Apr 30, 2002 at 12:00

        Next the week/day fields are added producing:

           May 1, 2002 at 12:00

        and finally, the exact fields (hour/minute/second) are added to
        produce:

           May 1, 2002 at 13:00

    A simple business calculation
        Assuming a normal Monday-Friday work week from 8:00 - 17:00:

           date  = Wed, Nov 23, 2011 at 12:00
           delta = 1 week, 1 day, 1 hour

        First, the week field is added:

           Wed, Nov 30, 2011 at 12:00

        Then the day field is added:

           Thu, Dec 1, 2011 at 12:00

        Then the exact fields are added:

           Thu, Dec 1, 2011 at 13:00

    A business example where a holiday impacts it
        In America, Jul 4 is a holiday, so Mon, Jul 4, 2011 is not a work
        day.

           date  = Mon, Jun 27, 2011 at 12:00
           delta = 1 week, 1 day, 1 hour

        First, the week field is added:

           Mon, Jul 4, 2011 at 12:00

        Since that is not a work day, it immediately becomes:

           Tue, Jul 5, 2011 at 8:00

        Then the day field is added:

           Wed, Jul 6, 2011 at 8:00

        and finally the remaining fields:

           Wed, Jul 6, 2011 at 9:00

    Calculation where daylight savings time impacts it (fall example)
        In the America/New_York timezone (Eastern time), on November 6,
        2011, the following time change occurred:

           2011-11-06 02:00  EDT  => 2011-11-06 01:00  EST

        Three simple calculations illustrate how this is handled:

           date  = 2011-11-05 02:30 EDT
           delta = 1 day

        Adding the day produces:

           2011-11-06 02:30  EDT

        which is valid, so that is the result.

        Similarly:

           date  = 2011-11-07 02:30 EST
           delta = -1 day

        produces:

           2011-11-06 02:30 EST

        which is valid.

        Finally:

           date  = 2011-11-05 02:30 EDT
           delta = 2 days

        produces:

           2011-11-07 02:30  EST

        The calculation will preserve the savings time where possible so the
        resulting day will have the same offset from UTC. If that is not
        possible, but the resulting day is valid in the other offset, that
        will be used instead.

    Calculation where daylight savings time impacts it (spring example)
        In the America/New_York timezone (Eastern time), on March 13, the
        following time change occurred:

           2011-03-13 02:00  EST  => 2011-03-13 03:00  EDT

        In this case, a calculation may produce an invalid date.

           date  = 2011-03-12 02:30 EST
           delta = 1 day

        produces:

           2011-03-13 02:30 EST

        This is not valid. Neither is:

           2011-03-13 02:30 EDT

        In this case, the calculation will be redone converting days to
        24-hour periods, so the calculation becomes:

           date  = 2011-03-12 02:30 EST
           delta = 24 hours

        which will produce a valid date:

           2011-03-13 03:30 EDT

EXACT, SEMI-EXACT, AND APPROXIMATE DATE/DATE CALCULATIONS
    This section contains more details about exactly how exact, semi-exact,
    and approximate calculations are performed for date/date calculations.

    When calculating the delta between two dates, the delta may take
    different forms depending on the mode passed in. An exact calculation
    will produce a delta which included only exact fields. A semi-exact
    calculation may produce a semi-exact delta, and an approximate
    calculation may produce an approximate delta. Note that if the two dates
    are close enough together, an exact delta will be produced (even if the
    mode is semi-exact or approximate), or it may produce a semi-exact delta
    in approximate mode.

    For example, the two dates "Mar 12 1995 12:00" and "Apr 13 1995 12:00"
    would have an exact delta of "744 hours", and a semi-exact delta of "31
    days". It would have an approximate delta of "1 month 1 day".

    Two dates, "Mar 31 12:00" and "Apr 30 12:00" would have deltas "720
    hours" (exact), "30 days" (semi-exact) or "1 month" (approximate).

    Approximate mode is a more human way of looking at things (you'd say 1
    month and 2 days more often then 33 days), but it is less meaningful in
    terms of absolute time.

    One thing to remember is that an exact delta is exactly the amount of
    time that has passed, including all effects of daylight saving time.
    Semi-exact and approximate deltas usually ignore the affects of daylight
    saving time.

## SUBTRACTION
    In exact and semi-exact calculations, and in delta-delta calculations,
    the the $subtract argument is easy to understand. When working with an
    approximate delta however (either when adding an approximate delta to a
    date, or when taking two dates to get an approximate delta), there is a
    degree of uncertainty in how the calculation is done, and the $subtract
    argument is used to specify exactly how the approximate delta is to be
    use. An example illustrates this quite well.

    If you take the date Jan 4, 2000 and subtract a delta of "1 month 1
    week" from it, you end up with Nov 27, 1999 (Jan 4, 2000 minus 1 month
    is Dec 4, 1999; minus 1 week is Nov 27, 1999). But Nov 27, 1999 plus a
    delta of "1 month 1 week" is Jan 3, 2000 (Nov 27, 1999 plus 1 month is
    Dec 27, 1999; plus 1 week is Jan 3, 2000).

    In other words the approximate delta (but NOT the exact or semi-exact
    delta) is different depending on whether you move from earlier date to
    the later date, or vice versa. And depending on what you are
    calculating, both are useful.

    In order to resolve this, the $subtract argument can take on the values
    0, 1, or 2, and have different meanings.

    $subtract in approximate date-date calculations
        In the call:

           $delta = $date1->calc($date2,$subtract,"approx");

        if $subtract is 0, the resulting delta can be added to $date1 to get
        $date2. Obviously $delta may still be negative (if $date2 comes
        before $date1).

        If $subtract is 1, the resulting delta can be subtracted from $date1
        to get $date2 (the deltas from these two are identical except for
        having an opposite sign).

        If $subtract is 2, the resulting delta can be added to $date2 to get
        $date1. In other words, the following are identical:

           $delta = $date1->calc($date2,2,"approx");
           $delta = $date2->calc($date1,"approx");

    $subtract in approximate date-delta calculations
        In the call:

           $date2 = $date1->calc($delta,$subtract);

        If $subtract is 0, the resulting date is determined by adding $delta
        to $date1.

        If $subtract is 1, the resulting date is determined by subtracting
        $delta from $date1.

        If $subtract is 2, the resulting date is the date which $delta can
        be added to to get $date1.

        For business mode calculations, $date1 will first be adjusted to be
        a valid work day (if it isn't already), so this may lead to
        non-intuitive results.

        In some cases, it is impossible to do a calculation with $subtract =
        2. As an example, if the date is "Dec 31" and the delta is "1
        month", there is no date which you can add "1 month" to to get "Dec
        31". When this occurs, the date returned has an error flag.

APPROXIMATE DATE/DATE CALCULATION
    There are two different ways to look at the approximate delta between
    two dates.

    In [Date::Manip] 5.xx, the approximate delta between the two dates:

       Jan 10 1996 noon
       Jan  7 1998 noon

    was 1:11:4:0:0:0:0 (or 1 year, 11 months, 4 weeks). In calculating this,
    the first date was adjusted as far as it could go towards the second
    date without going past it with each unit starting with the years and
    ending with the seconds.

    This gave a strictly positive or negative delta, but it isn't actually
    how most people would think of the delta.

    As of [Date::Manip] 6.0, the delta is 2:0:0:-3:0:0:0 (or 2 years minus 3
    days). Although this leads to mixed-sign deltas, it is actually how more
    people would think about the delta. It has the additional advantage of
    being easier to calculate.

    For non-business mode calculations, the year/month part of the
    approximate delta will move a date from the year/month of the first date
    into the year/month of the second date. The remainder of the delta will
    adjust the days/hours/minutes/seconds as appropriate.

    For approximate business mode calculations, the year, date, and week
    parts will be done approximately, and the remainder will be done
    exactly.

## KNOWN BUGS
    None known.

## BUGS AND QUESTIONS
    Please refer to the [Date::Manip::Problems] documentation for information
    on submitting bug reports or questions to the author.

## SEE ALSO
    [Date::Manip] - main module documentation

## LICENSE
    This script is free software; you can redistribute it and/or modify it
    under the same terms as Perl itself.

## AUTHOR
    Sullivan Beck (<sbeck@cpan.org>)